Thursday, May 21, 2020

Ulaanbaatar's New Chinggis Khaan International Airport launches official operations on 1 July 2020

Source : Mongolian Day
Ref : http://www.minhangshi.com/m/h5/detail/8298743
Translation, editing : Gan Yung Chyan
                                  / KUCINTA SETIA

Images of New Chinggis Khan International Airport : Mongolian Day


At the routine work meeting of the Mongolian government held today, 20 May 2020, a resolution was adopted on some of the measures to be taken on the issue of Mongolian international airports. According to the resolution, starting from July 1 of this year, the "Buyant Ukhaa" airport, the current Chinggis Khaan International Airport in Ulaanbaatar, Mongolia, will be officially relocated to Khoshig Valley, south of Ulaanbaatar and named the New Chinggis Khaan International Airport, also known formerly as New Ulaanbaatar International Airport (NUBIA).


At the meeting, the country's border inspection department also carried out clearing the matters to be solved and resolved to the Minister of Finance of Mongolia and the head of the National Border Port Committee on the issues such as the financial security required by the national border inspection department to carry out the border inspection at the new airport.


The new airport in the Khoshig Valley was named "Chinggis Khaan" International Airport last year. Since both the old and new airports are called Chinggis Khaan International Airport, in order to avoid confusion, Mongolian Geri suggested to distinguish between new and old, or Buyant Ukhaa and Khoshig.


Image of Buyant Ukhaa Chinggis Khaan International Airport : Kucinta Setia

However, according to the deputy director of the Mongolian Civil Aviation Administration, Б · Alateng Chaomu, said at the first MIAT flight ceremony organized by the new airport in September last year, after the official opening of the new Chinggis Khaan International Airport, it plans to relocate all international and domestic flights to the new Chinggis Khaan International Airport operates, and the old Chinggis Khaan Airport will be converted into a flight training base and aircraft maintenance service centre. Therefore, the problem of running to the wrong airport may generally not occur. 



According to the data, the new Genghis Khan International Airport was started in May 2013. The main building was completed in 2018. The total project budget is 65.4 billion yen (approximately 4.16 billion yuan), which was constructed by the Japanese government with a concessional loan. The new Chinggis Khaan International Airport has a total area of ​​53,726 square meters, with a total of 6 boarding gates (5 international and 1 domestic) and 21 parking spaces. The airport runway is 3600 meters long and 45 meters wide. The designed annual passenger throughput is 11 million passengers and the cargo handling capacity is 11,900 tons. It is 30.6 km from Sukhbaatar Square in central Ulaanbaatar and 22 km from Buyant Ukhaa.


New Airport Expressway. Image by Mongolian Day.

The total length of the expressway connecting the New Chinggis Khaan International Airport to the urban area is 32.226 kilometres long, 32.5 metres wide, asphalt concrete pavement, two-way six lanes. It was officially opened on 5 July 2019. The construction funds are undertaken by China Railway Fourth Bureau Group Co., Ltd.

(Part of the comprehensive compilation news comes from the Mongolian GoGo network on 20 May 2020)

See also : New Ulaanbaatar International Airport, www.nubia.mn

No comments:

Post a Comment

Yamato Transport launches domestic cargo flights under Spring Japan's operations

 Report, photos copyright by : Gan Yung Chyan, KUCINTA SETIA Major Japanese shipping company Yamato Holdings Co. Ltd. has launched domestic ...